Nine regulators join Boeing 737 MAX review

Steve Creedy

By Steve Creedy

Published Sat Apr 20 2019

Regulators from Australia, Brazil, Canada, China and Europe are among the nine authorities that have confirmed they will participate in the Boeing 737 MAX Joint Authorities Technical Review due to begin at the end of the month. The US Federal Aviation Administration announced the list Friday US time and said the first meeting is due to take place on April 29. The review is expected to take 90 days and is being chaired former national transportation safety Board chairman Chris Hart. READ our 737 MAX coverage "The team will evaluate aspects of the 737 MAX automated flight control system, including its design and pilots’ interaction with the system, to determine its compliance with all applicable regulations and to identify future enhancements that might be needed,'' the FAA said. Confirmed participants are: Australia Civil Aviation Safety Authority (CASA) Brazil Agencia Nacional de Aviação Civil (ANAC) Canada Transport Canada Civil Aviation (TCCA) China Civil Aviation Administration of China (CAAC) European Union European Aviation Safety Agency (EASA) Japan Japan Civil Aviation Bureau (JCAB) Indonesia Directorate General of Civil Aviation (DGCA) Singapore Civil Aviation Authority of Singapore (CAAS) United Arab Emirates General Civil Aviation Authority (UAE GCAA) Boeing answers in the video below why it cannot say more about the two crashes. https://www.youtube.com/watch?v=udcJkfFb0TA&feature=push-sd&attr_tag=dO6LWz25hcOyO3bS%3A6 The review is one of several being undertaken into the certification of the MAX following the crash of two aircraft in less than five months. Boeing is working on modifications to a controversial software linked to both crashes, the maneuvring augmentation characteristics system, MCAS. Boeing chief executive Dennis Muilenburg tweeted on April 16 that the company was making steady progress towards certification of the software and related training changes. The company had just completed the last official engineering test flight of the updated software prior to a certification flight with the FAA. Muilenburg said this had involved 120 MAX flights totalling more than 203 hours of flying time. He had completed a demonstration flight and had seen first hand the software in its final form “operating as designed across a range of flight conditions”. However, potential differences emerged between Canada and the US on whether training for the new software should be in a simulator or be computer-based. READ: Canadians and US differ on 737 MAX training    

Comments

No comments yet, be the first to write one.